Turn this off if your build site has no building-code enforcement (e.g. out in the county / outside city limits). The placement notes and this report then stay hidden.
Preliminary screening against IBC 2024, ASCE 7-22, AISC 360-22 & ACI 318-19 — for guidance only, not stamped engineering. A website can’t see your soil, lot lines, or final use, so the occupancy, loads, and structure are confirmed by the licensed engineer who stamps your building’s drawings and by your local building department.